Vol 26 No 7 (2020)
Published: 2020-07-03
Articles
Research on investment risk influence factors of prefabricated building projects
Abstract 4671 | PDF Downloads 2872 | DOI https://doi.org/10.3846/jcem.2020.12917
Page 599-613
Developing a comprehensive risk assessment model based on fuzzy Bayesian belief network (FBBN)
Abstract 3102 | PDF Downloads 1815 | DOI https://doi.org/10.3846/jcem.2020.12322
Page 614-634
A novel decision-making model for selecting a construction project delivery system
Abstract 2851 | PDF Downloads 1615 | DOI https://doi.org/10.3846/jcem.2020.12915
Page 635-650
Predicting behavioural resistance to BIM implementation in construction projects: an empirical study integrating technology acceptance model and equity theory
Abstract 4573 | PDF Downloads 2564 | DOI https://doi.org/10.3846/jcem.2020.12325
Page 651-665
Factors causing rework and their impact on projects’ performance in Egypt
Abstract 4794 | PDF Downloads 3149 | DOI https://doi.org/10.3846/jcem.2020.12916
Page 666-689
Invited Review
Life cycle sustainability assessment for multi-criteria decision making in bridge design: a review
Abstract 2672 | PDF Downloads 1381 | DOI https://doi.org/10.3846/jcem.2020.13599
Page 690-704