Vol 22 No 7 (2016)
Published: 2016-07-12
Articles
Maximizing the value of residential projects using fuzzy rule based linear programming
Abstract 554 | PDF Downloads 1047 | DOI https://doi.org/10.3846/13923730.2014.914102
Page 853-861
Evaluating motivation of construction workers: a comparison of fuzzy rule-based model with the traditional expectancy theory
Abstract 1537 | PDF Downloads 2295 | DOI https://doi.org/10.3846/13923730.2014.914103
Page 862-873
Study on correlation between fire fighting time and fire loss in urban building based on statistical data
Abstract 655 | PDF Downloads 547 | DOI https://doi.org/10.3846/13923730.2014.914101
Page 874-881
Linear and nonlinear fractional hereditary constitutive laws of asphalt mixtures
Abstract 837 | PDF Downloads 528 | DOI https://doi.org/10.3846/13923730.2014.914104
Page 882-889
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
Abstract 725 | PDF Downloads 1028 | DOI https://doi.org/10.3846/13923730.2014.928363
Page 890-902
Developing construction defect management system using BIM technology in quality inspection
Abstract 2056 | PDF Downloads 2345 | DOI https://doi.org/10.3846/13923730.2014.928362
Page 903-914
An insulation thickness optimization methodology for school buildings rehabilitation combining artificial neural networks and life cycle cost
Abstract 725 | PDF Downloads 605 | DOI https://doi.org/10.3846/13923730.2014.928364
Page 915-923
Fuzzy method for analysing uncertainty in the sustainable design of concrete structures
Abstract 893 | PDF Downloads 595 | DOI https://doi.org/10.3846/13923730.2014.928361
Page 924-935
Information platform to improve technological innovation capabilities: role of cloud platform
Abstract 702 | PDF Downloads 579 | DOI https://doi.org/10.3846/13923730.2014.929023
Page 936-943
Time reduction effect of the enhanced TACT method for high-rise residential buildings
Abstract 615 | PDF Downloads 569 | DOI https://doi.org/10.3846/13923730.2014.945949
Page 944-953
Government motivation-embedded return guarantee for urban infrastructure projects based on real options
Abstract 665 | PDF Downloads 481 | DOI https://doi.org/10.3846/13923730.2016.1204362
Page 954-966
Proposing a neural network model to predict time and cost claims in construction projects
Abstract 1479 | PDF Downloads 1150 | DOI https://doi.org/10.3846/13923730.2016.1205510
Page 967-978
Corrigenda
Corrigendum
Abstract 484 | PDF Downloads 317 | DOI https://doi.org/10.3846/13923730.2016.1203479
Page 979