[1]
Lee, M. and Lee, U.-K. 2020. A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase. Journal of Civil Engineering and Management. 26, 5 (May 2020), 410-420. DOI:https://doi.org/10.3846/jcem.2020.12185.