[1]
Senouci, A.B. and Mubarak, S.A. 2016. Multiobjective optimization model for scheduling of construction projects under extreme weather. Journal of Civil Engineering and Management. 22, 3 (Mar. 2016), 373-381. DOI:https://doi.org/10.3846/13923730.2014.897968.