[1]
Yousefi, V., Haji Yakhchali, S., Khanzadi, M., Mehrabanfar, E. and Ĺ aparauskas, J. 2016. Proposing a neural network model to predict time and cost claims in construction projects. Journal of Civil Engineering and Management. 22, 7 (Jul. 2016), 967-978. DOI:https://doi.org/10.3846/13923730.2016.1205510.