[1]
Valipour, A., Yahaya, N., Md Noor, N., KildienÄ—, S., Sarvari, H. and Mardani, A. 2015. A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study. Journal of Civil Engineering and Management. 21, 7 (Jul. 2015), 933-947. DOI:https://doi.org/10.3846/13923730.2015.1051104.