[1]
Markiz, N. and Jrade, A. 2017. An expert system to optimize cost and schedule of heavy earthmoving operations for earth- and rock- filled dam projects. Journal of Civil Engineering and Management. 23, 2 (Feb. 2017), 222-231. DOI:https://doi.org/10.3846/13923730.2015.1027258.