Gunduz, Murat, and Haci Bayram Sahin. 2015. “An Early Cost Estimation Model for Hydroelectric Power Plant Projects Using Neural Networks and Multiple Regression Analysis”. Journal of Civil Engineering and Management 21 (4):470-77. https://doi.org/10.3846/13923730.2014.890657.